The Process

The Process

(i) The bulk procurement of raw materials such as pooled latex ,intermediate products are being tested based on COA from the production on the batch to batch basis.

(ii) The result of analysis are being approved by the Head of Quaility control and recorded systematically.

(iii) The laboratory is fully equipped to test the Biochemistry and Microbiological parameters of the products and do have well trained technical staffs and record the same.
(i) The plant has been designed in sucha way there is no cross-contamination happening within the product from the raw material input to finished products .

(ii) The machines are equipped with fully SS316 grade including the piping system of the plant.

(iii) The production line is being designed in such a way to minimize the human contact to avoid microbial loads.

(iv) Water quality and air quality are being monitor on day to day basis and recorded such a way to fix the issue if anything raised.

(v) Staffs and labours are provided with PPEs (mask,gloves,caps ,shoes,uniforms) to maintain product safety.

(vi) Employees are well aware about Food Safety, Process control ,GMP and HACCP principles and work efficiently.

(vii) FSSC 22000 certification is under progressing.